New nuclear reactors at the Kola NPP-2

The other day, plans were announced for the construction of new power units at the Kola NPP-2. Director of the Kola NPP Vasily Omelchuk said at a press conference on June 18, 2021 that the replacement station will be a two-unit, that is, it will include two VVER-type power units with a capacity of 600 MW each with spectral regulation. The project is currently in preparation for development. The start of construction is scheduled for 2028, and the commissioning of the first unit is scheduled for 2034.





But in order to understand why it is necessary to replace power units and why these are their parameters, let’s first look at the NPP itself and its role in the regional power system.





By the way, as usual, I recorded a video version of this article. Do not forget to subscribe to  my youtube channel  (this will greatly help its development!), Where I talk about nuclear energy and nuclear technologies, and not only about what I publish in the form of large articles.





The first nuclear power plant in the Arctic Circle

, 170 12 . , , 1970-. , , - . , 20 . - . - , , 700 .





Kola nuclear power plant - the first and most powerful nuclear power plant in the Arctic Circle
-

-440, –  1760 . ( 3500 ). , – , – .





, – 60-65% ,  80% . 90% – , .. 10% .





1600 - , 250 - . , , . . . , , 80% . , , 300- – . 18% , , . 4% . 2 . . . , .. , , .. , .





- , . . , , .     , .





, , . – , , .





, - Carbon free zone. , , , .     , 5 . 2021 200 . 2025 12 . . "" . , , .





. 2023     1 , 10 . . .





. , . , , . , -   .





Author at the Kola NPP and in the town of Polyarnye Zori.  At the NPP itself, travel agents cannot, of course, take pictures.  So your photos are only at the sign.
. . , , . .

-440

, , . -440. "440" – . – . - . , , , , . 300 , , 120 . , , . PWR – Pressurized water reactor, .





Reactor hall of the first stage of the Kola NPP

- - .  300 442 - PWR . 60 -, , . - 1960- , - - 1000 1600 .





Installation of the newest VVER-440 reactor pressure vessel manufactured by Ε koda at Unit 3 of the Mochovce NPP in Slovakia, 2010.
-440 , 2010 .

-440 30, 20. , – ( , 2 ), (4 ), (4 ), (2 2 ), (2 ) (1 ). , . -440 , ,   .





Finnish NPP Loviisa with two VVER-440 reactors, the closest foreign NPP to St. Petersburg, 200 km in a straight line.
c -440, - , 200 .

-440 : , 220 1200 . , , , – 1000 . , – -1200.





1973 1974 . -440. 45 . 30 , , , 2000-. 15 , 15 – 2033 2034 . .. 60 .





. -, - . , , . , , , .. .





, . . . , 7%, -440 15%.  , , , . , , , .





. , . , - . , , , - , , . , . .





, -1200, , 60 20. -440 -1000, 50 , 30 . .  , , . , .





Reactor annealing plant

80- .  1989   -440 . – , , , . 10-15 , , .





, , . . -440 475 150 . 2-3 . -440 -1000, , .





, . , -440   . -440 (), , () (). 1989 2017 2019 .





, – , . 30 , 14   50 . , , , 80 . , , , - , , . , - , ,     () , .





LCOE indicator for different types of generation in the USA and China.  Long-term operational is the extension of the operation of a nuclear power plant.
LCOE . Long-term operational - .

-600

, , .   Β« -2 , 600 .Β»





, 600 . , , . 1760 , 60-65%. .. 600 . . 10 . -2 , , .





600 1200 . , . , , . , , .





, - , . , , - .   -, .





, . . , . . . ( 1 ) – . -235. , , , ( 0,4 ). .





, . () , , . , , , . , , CANDU, , - .





. . ? -235 , «». , , "" . - . , . - - ( , .. ), .. , . 





? -235, -238 -239. , -235, .. . -, , , . . 1, 0,4.   0,8.





, , , . – . ?





, - . 2. , . , . , . , , , . -238 – . , - .





7- ,   ,   . 19 250 .





Possible design option for VVER-S fuel assemblies with displacement rods
-

– , . . , .. . 110 /, -  80 /.





, , - 600 -1000 -1200. . , 4, 2, -600 , -440 (1890 . 2314 ). . –   , , .. .





Possible layout and technical characteristics of VVER-600S from the presentation of OKB Gidropress in 2014.
-600 2014 .

-   . . , . , . , , -     . , " ".





- – .    2019 , 30% . , MOX-, . MOX- .





.. . , , . , . , .





Comparison of uranium savings for different VVER-S fuel cycles from the presentation of the Kurchatov Institute in 2014.
- 2014 .

- , -10 - . - (   ) . , .. ( ), , , - .





, . , . -1200 3+, . - 5 -800 ( -1200 ) --300 ( "4"). -200 () () , -40 (). - ( ) .





,   , . .





:

  • -600. , 2014 .





  • – - 238. , 2014 .





  • - .





  • «» - 2019 .





  • (@tnenergy)   .





  • - 2020 2025 .






    - ITSOFT β€” - . UPTIME 100%. GPU- ASIC-, GPU-, , SSL-, .