A hybrid of a computer and an IP phone. Anatomy of the GM-Box hardware platform. Part 3 - testing and production

I continue to talk about the development of the GM-Box G1 hardware platform. In previous posts, I already managed to share how we prototyped and developed a serial version of the device , that is, all our ideas, insights, expectations took material form, and we got a product that could already be produced.

– . , .

, . , , «» - , « »? , :

  • - ;

  • - ;

  • , , .

The fantasy of the ideal workplace

, , . «» ? (). , , , , , , , .

:

, . , , . – . ( ).

, , «, », (. ). :

  • . Product Requirement Document (PRD, ).

  • . EA (Eurasian Conformity) CE (Conformité Européenne). PRD.

  • (), , - : , , , , (), , , , , .

  • EVT (Engineering Validation) - . .

  • DVT (DesignValidation) - , (). .

  • PVT (Production Validation) - . . , : CE EAC.

  • MP (Mass Production) - . - .

 :
:
 :
:

CE (, ). , . CE, – .

:

  • BurnInTest. + . , . . eMMC SSD, DDR, USB 2.0\3.0 ;

  • CPUZ ;

  • HWI ;

  • IDPT , - .

Linux. , . . , .

   GM-Box
GM-Box

GM-Box G1 ODM (Original Design and Manufacturing) . . . , ODM :

  • ;

  • , ;

  • ;

  • .

ODM . «» PVT (Production Validation) , . () .

     GM-Box
GM-Box

«» , – SOP (Standard Operating Procedures).

SOP  GM-Box
SOP GM-Box

, .

, .

, . .

:

  • – 10 000 20 000 ;

  • ;

  • ;

  • .

:

  • , – ;

  • ;

  • ;

  • ;

  • ;

  • ;

  • ( );

  • ;

  • ;

  • , , ..;

  • - ;

  • ;

  • ;

  • , ;

  • ;

  • ;

  • ;

  • ;

  • ;

-: !

 GM-Box
GM-Box

20 000 ( ). .

, , Service Desk. 1 \ 1 ERP. , 1, .

. , - , . !

( ) – , . . , . . – .

GM-Box . . , , , .

. , , – , , , , . « » . « » .

      « »
« »

1.      . : https://t.me/konveerum

2.      #28: . GM-Box G1 . .




All Articles